Zebra S4M Especificaciones Pagina 268

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 404
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 267
Preventive and Corrective Maintenance
Peel Option
244
13291L-001 Rev. A S4M Maintenance Manual 10/27/05
Install the Peel Assembly
1. See Figure 126. Using the hex key (Allen wrench) supplied, install the two mounting
screws from the kit into the tear bar mounting screw holes. Tighten them to within 1/8 in.
of the platen housing.
Figure 126 • Install Peel Assembly
1
Peel assembly
2
Mounting slots (2)
3
Mounting screws (2)
4
Platen housing
5
Rest pems on housing here
6
Peel lever
1
2
3
4
5
6
Vista de pagina 267
1 2 ... 263 264 265 266 267 268 269 270 271 272 273 ... 403 404

Comentarios a estos manuales

Sin comentarios